
Serrote Wind and Solar Complex - Ceará
The Serrote Hybrid Complex (Wind and Solar photovoltaic), located in the municipality of Trairi, in Ceará, was one of Qair’s first projects in Brazil. There are 49 V150 wind turbines from the Danish manufacturer Vestas, in operation, with a total installed capacity of 205.8 MW.
The second stage of the project, called Serra do Mato, considered an expansion, has another 29 wind turbines with a generation capacity of 121.8 MW. And the solar-photovoltaic stage has a capacity of 101 MW.
Status:
In Commercial Operation