Projects in operation

Projects in operation

With its experience in France and abroad, Qair dominates the entire value chain of wind project development, developing, financing and building. Our strategy is based on a model of openness to different opportunities, whether through the implementation of large-scale projects, or through the acquisition of operational under development.

Its strong implementation capacity resides in the general mastery of all stages of a project, but also in the flexibility of structuring financial agreements. Today, Qair operates 115 MW of wind projects and continues its development in territories such as Tunisia, Vietnam and Iceland.

In Brazil, the group built the Serrote Wind Complex, in the state of Ceara, consisting of 49 wind turbines, which is already in commercial operation with a capacity of 205 MW. The second expansion phase, called Serra do Mato, contains another 29 wind turbines that are also already operating with a capacity of 121.8 MW. In addition, there will be an integration for the production of solar-photovoltaic energy with a capacity of 101 MW.

Qair is also present in Rio Grande do Norte, with the commercial operation of the Afonso Bezerra wind farm, which has 38 wind turbines and a capacity of 159.6 MW. It does not stop there! We added a portfolio of projects for the future in different states. Always looking to think, do and produce differently to make a positive impact.